Prefabicated vertical drains (PVDs) for accelerated consolidation of soft soils

Skip Navigation LinksHome PageApplicationsSoil improvementPrefabicated vertical drains (PVDs) for accelerated consolidation of soft soils

Prefabicated vertical drains (PVDs) for accelerated consolidation of soft soils

 

Acceleration of Consolidation by means of Vertical Drains

Acceleration of Consolidation by means of Vertical Drains

Acceleration of Consolidation by means of Vertical Drains - HaEmek railway

Acceleration of Consolidation by means of Vertical Drains - HaEmek railway

Acceleration of Consolidation by means of Vertical Drains - Balfouria

Acceleration of Consolidation by means of Vertical Drains - Balfouria

Acceleration of Consolidation by means of Vertical Drains - HaEmek railway

Acceleration of Consolidation by means of Vertical Drains - HaEmek railway

Acceleration of Consolidation by means of Vertical Drains - Balfouria

Acceleration of Consolidation by means of Vertical Drains - Balfouria

Very slow consolidation of saturated soft clay or organic soil is a process which often requires up to 20-25 years. Consolidation can be accelerated by installing vertical drains to a depth of up to 35 meters, shortening its settlement rate from several years to several months. This process also improves the mechanical properties of the soil, such as shear resistance and bearing capacity.

This advanced technology, employing geosynthetic vertical drains, improves vertical water transport, thus permitting immediate use of the soil while preventing damage caused by differential settlement over the years. The solution of PVDs is economically preferable compared with other accelerated soil improvement alternatives such as vibro compaction and others.

Advantages:

  • Prevention of damages to embankments, roads and engineering structures as a result of small post-construction settlements.
  • Significant economic advantages in comparison to other alternatives such as preloading (time consuming), piled embankments, vibro compaction, stone columns etc.
  • Low construction times, fast economic use of structure.